Monte Cañón

Degraded

Galicia · Wind · 74 MW installed · 6 technicians · manager Kiarra Swaniawski

Output now

14.3 MW

Load factor

19 %

Energy today

192 MWh

Availability

96.9 %

Producing

12 / 16

Open alarms

4

Generation
Last 12 hours
Wind, solar and battery power at the point of interconnection. A charging battery shows below zero.
Conditions
Resource and grid

Wind

10.1 m/s S

Irradiance

0 W/m²

Temperature

14.6 °C

Cloud cover

49 %

Conditions

Partly cloudy

Substation

Mesón SE 220 kV

Voltage

220.8 kV

Frequency

49.963 Hz

Power factor

0.987

Curtailment

19 %

Day-ahead price

69.63 €/MWh

Assets

16 assets on site. Open one for its live 3D view.

Power flow

Wind turbine

WTG-01

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
81%

Output

5.05 MW

Today

13.4 MWh

Wind

11.6 m/s

Wind turbine

WTG-02

Siemens Gamesa SG 6.6-170 · 4.2 MW

Producing
7%

Output

0.29 MW

Today

16.0 MWh

Wind

6.2 m/s

Wind turbine

WTG-03

Nordex N149/4.0-4.5 · 6.2 MW

Producing
2%

Output

0.12 MW

Today

15.7 MWh

Wind

5.0 m/s

Wind turbine

WTG-04

Siemens Gamesa SG 5.0-145 · 5.0 MW

Producing
3%

Output

0.15 MW

Today

14.6 MWh

Wind

5.4 m/s

Wind turbine

WTG-05

Nordex N149/4.0-4.5 · 6.2 MW

Producing
28%

Output

1.72 MW

Today

22.3 MWh

Wind

8.7 m/s

Wind turbine

WTG-06

Vestas V162-6.2 · 5.0 MW

Producing
1%

Output

0.06 MW

Today

14.2 MWh

Wind

4.7 m/s

Wind turbine

WTG-07

Vestas V162-6.2 · 4.2 MW

Curtailed
1%

Output

0.04 MW

Today

8.1 MWh

Wind

4.9 m/s

Wind turbine

WTG-08

Nordex N149/4.0-4.5 · 6.2 MW

Producing
10%

Output

0.63 MW

Today

15.6 MWh

Wind

6.7 m/s

Wind turbine

WTG-09

Vestas V150-4.2 · 6.2 MW

Producing
27%

Output

1.69 MW

Today

16.9 MWh

Wind

8.5 m/s

Wind turbine

WTG-10

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
36%

Output

2.23 MW

Today

17.1 MWh

Wind

9.3 m/s

Wind turbine

WTG-11

Siemens Gamesa SG 6.6-170 · 5.0 MW

Producing
9%

Output

0.43 MW

Today

7.6 MWh

Wind

6.5 m/s

Wind turbine

WTG-12

Vestas V162-6.2 · 5.0 MW

Standby
0%

Output

0.00 MW

Today

12.6 MWh

Wind

10.3 m/s

Wind turbine

WTG-13

Siemens Gamesa SG 5.0-145 · 4.2 MW

Producing
39%

Output

1.65 MW

Today

9.5 MWh

Wind

9.5 m/s

Wind turbine

WTG-14

Vestas V150-4.2 · 4.2 MW

Curtailed
6%

Output

0.25 MW

Today

8.2 MWh

Wind

7.1 m/s

Inverter skid

INV-01

SMA Sunny Central 4600 UP · 5.0 MVA

Producing
19%

Output

0.93 MW

Today

18.1 MWh

Availability

99.6 %

Inverter skid

INV-02

Sungrow SG3125HV-MV · 5.0 MVA

Curtailed
27%

Output

1.37 MW

Today

9.3 MWh

Availability

94.2 %

Alarms
Site alarms
Most recent events from this site's assets.

Blade ice detected

WTG-02· 10-29 02:38
Medium

IGBT temperature high

INV-02· 10-28 19:47
Low

Pitch system hydraulic pressure low

WTG-05· 10-28 12:20
Low

Yaw misalignment above limit

WTG-07· 10-28 08:02
Low